Contract awards


Procurement Ref No Description Contractor units Amount
Contract No.CWSB/T/07/2014-2015(B)  Lot 1 (b) - Rehabilitation of Kikoneni Treatment Works, Augmentation of Raw Water Main and Laying Gravity Main to Mkanda Dam and Metering  A.A.BAYUSUF & SONS LTD   KSH25,538,629.60  View
Contract No.CWSB/T/07/2014-2015(c)  Lot 1 (c) - Extension of Mbegani Water Supply Main and Rehabilitation of Kibuyuni-Magbwasheni Pipeline  Jumbo Interlinks Limited   KSH24,486,440.00  View
Contract No.CWSB/T/07/2014-20159(A)  Lot 1 (a) - Rehabilitation of Raw Water Pumping Station;   Jumbo Interlinks Limited   KSH15,249,476.00  View
TENDER No. CWSB-MDP/17-01/2013-2014 (R)  The principle components of the works at Kahindi consist of,setting out of the dam and ancillary works, earthworks excavations and filling, compaction of fill layers to 85% MDD, shaping dam embankments,construction of water intake infrastructure and cattle troughs and testing and commissioning of works   Lisa General Suppliers Limited   KSH9,553,603.40  View
TENDER No. CWSB-MDP/17-03/2013-2014(R)  The principle components of the works at Kazungu & Kazidi consist of : setting out of the dam and ancillary works,earthworks excavations and filling, compaction of fill layers to 85% MDD, shaping dam embankments,construction of water intake infrastructure and cattle troughs and testing and commissioning of works   A.Niaz & Sons Limited   KSH18,067,588.80  View
TENDER No. CWSB-MDP/17-05/2013-2014(R)  The principle components of the works at Mwaruphesa consist of;setting out of the dam and ancillary works, earthworks excavations and filling, compaction of fill layers to 85% MDD, shaping dam embankments,construction of water intake infrastructure and cattle troughs and testing and commissioning of works   Dannex Investement& Engineering Works Limited   KSH12,257,224.10  View
TENDER No. CWSB-MDP/17-08/2013-2014 (R)  The principle components of the works at kithusi consist of;setting out of the dam and ancillary works, earthworks excavations and filling, compaction of fill layers to 85% MDD, shaping dam embankments,construction of water intake infrastructure and cattle troughs and testing and commissioning of works   Kamari Investment Limited   KSH14,466,650.00  View
TENDER No. CWSB-MDP/17-06/2013-2014  The principle components of the works Baluya & Ngala Mose consisted of;setting out of the dam and ancillary works, earthworks excavations and filling, compaction of fill layers to 85% MDD shaping dam embankments,construction of water intake infrastructure and cattle troughs and testing and commissioning of works   Lead Engineering Ltd   KSH13,411,850.90  View
TENDER No. CWSB-MDP/17-04/2013-2014  The principle components of the works at Lutsanga Gunia and Waa consist of;setting out of the dam and ancillary works, earthworks excavations and filling, compaction of fill layers to 85% MDD, shaping dam embankments,construction of water intake infrastructure and cattle troughs and testing and commissioning of works   Cellion Investment limited   KSH15,796,854.00  View
CWSB/WaSSIP-AF/G/17/2012  Supply and delivery of Backhoe Excavator rating 4400-5000 cc  Achelis Material Handling Limited   KSH7,551,000.00  View
CWSB/WaSSIP-AF /W/19/2012/A  Installation of 222 Nr. Plastic tanks (10,000 litres capacity) within Coast Water Services Board Area   Burale General Construction Limited   222  KSH42,567,323.40  View
CWSB/WaSSIP-AF/WDR/14/2013(C)  Construction of elevated steel tanks at Borehole locations in the Coast Water Services Board area  Berkai Engineering and Agricultural Supplies Limited   15  KSH64,889,885.30  View
CWSB/WaSSIP-AF/WDR/14/2013 (A)  Equipping and commissioning of existing boreholes with submersible pumpsets, gen - sets, solar panels and fittings in the Coast Water Services Board Region ( Lot 1 )  Export-Hydro pump and Services (Africa) Limited   10  KSH58,929,678.64  View
CWSB-MDP/17-02/2013-2014(R)  Construction of Small Earth Dams at Maponda and Madiani (Ndavaya) Lot 2  Sourcing and Construction Industries Company Limited   KSH24,685,496.00  View
CWSB/WaSSIP-AF/W/19/2012/B  Installation of 145 Nr. Plastic Tanks (10,000 litres capacity) within Northern Water Services Board Area (Garissa, Mandera & Wajir Counties)   Lenda Construction Company Limited   145  KSH35,231,307.00  View
CWSB/WaSSIP - AF/W/20B/2012  Extension of Services to Informal Settlements in Mombasa, Matopeni, Shauri Yako, Kisumu Ndogo & Maweni  Suhufi Agencies Limited   KSH149,222,676.20  View
CWSB/AF-WaSSIP/GDR/15/2012  Supply and Installation of Stand-by Generating sets for Various Schemes in Coast Water Services Board Region  Jos Hansen & Soehne (EA) limited   KSH29,492,639.09  View
CWSB/WaSSIP-AF/G/17/2012 (B)  Supply and Delivery of Vehicles and Machinery for Bulk Water Services ( Lot G1.4 - Light Duty truck with Rigid Bed and Crane (1 No.) and Lot G1.5-Medium Duty truck with Rigid Bed and Crane (1 No.)   Simba Corporation Limited   KSH19,929,000.00  View
CWSB/WaSSIP-AF/LDE/G005/2014.  Supply and Delivery of Leak Detection Equipment(Lot.1 - Leak Detection Equipment)  Nairobi Ironmongers Limited   KSH23,888,901.67  View
CWSB/WaSSIP-AF/G/17/2012(A)  Supply and Delivery of Vehicles for Bulk Water Services: Lot G1.3 33 Seater 4 x 2 WD Staff Minibus,Lot G1.1 4 x 4 WD Station Wagon Vehicle,Lot G1.6 Heavy Duty Truck/Prime Mover and Lot G1.7 Vehicle Trailer/ Low Loader  General Motors (EA) Limited   KSH26,235,280.00  View
CWSB/WaSSIP-AF/LDE/G005/2014(C)  Supply and Delivery of Leak Detection Equipment; Lot 3 - Leak repair Equipment   Coast Industrial & Safety Supplies Limited   KSH5,101,768.00  View
CWSB/WaSSIP-AF/G/14/2012  Supply and Delivery of Barges, Rubber Boats and Engines for Lamu and Wasini Islands - Lot 1 - Construction, Testing & Commissioning of Barges for Lamu and Wasini Islands of engine capacity 180 – 185Hp  Kenya Marine Contractors (EPZ) Limited   KSH56,354,000.00  View
CWSB/WaSSIP-AF/G/8/2012(C)  Supply and Installation of Geographic Information Systems in Six (6) WSP’s and Bulk Water Supply Unit;Lot G1.3 -Supply, Installation and Maintenance of Seven (7 No.) Heavy Duty LaserJet Printers, A0 Plotter, Seven (7 No.) Scanners, Thirty Five (35 No.) Hand Held GPS Equipment and One (1 No.) Differential GPS reference Station  Geomaestro Consult Africa Limted JV Pisu & Company Limited   KSH21,330,875.00  View
CWSB/WaSSIP-AF/MRK/G020/2014(B)  Supply and Delivery of MOWASCO Couplings; Lot 2- Repair clamps and Air valvesRepair Kit  Rope Ebginering Limited  KSH6,349,080.00  View
CWSB/WaSSIP-AF/G/12/2012(A)  Supply and Delivery of Mini-Lorries, Water Bowsers and 4WD Drought Monitoring Vehicles for CWSB and NWSB;Lot 1 - Utility Mini-Lorries 4150 - 4500cc   General Motors (EA) Limited   10  KSH98,383,000.00  View
CWSB/WaSSIP-AF/G/8/2012(A)  Supply, Installation and Maintenance of Seven (7No.) Web Based Geographic Information Systems (GIS) with 5 client licenses each, One (1No.) Server and One (1 No.) 1.5 KVA UPS - Lot G1.1   Minimix Agencies Ltd  KSH18,968,031.00  View
CWSB/WaSSIP-AF/MRK/G020/2014(C)  Supply and Delivery of MOWASCO Repair Kit - Meter Testing Bench - Lot 3  Tradecon(Msa) Limited   KSH33,608,100.00  View
CWSB/WaSSIP-AF/WDR/14/2013 (D)  Development of borehole water sources and equipping with submersible pump sets, elevated steel tanks and gen-sets in the Northern Water Services Board area - Lot 4.  Export – Hydro pumps & services ltd   KSH122,429,429.64  View
CWSB/AF- WaSSIP/C/1/2012   Review and updating of previous studies, conceptual and detailed design, tender documents preparation and construction supervision for the emergency immediate works at Baricho for lot 1,2&3   Fitchner Water & Transportation GMBH  KSH361,131,600.00  View
CWSB/WaSSIP-AF/C/4/2012  Supervision Services for the Rehabilitation of the Bulk Pipeline System Works   Lahmeyer GKW (Germany)   KSH98,524,300.00  View
CWSB/AF- WaSSIP/C/6/2012   Customer identification survey and infrastructure mapping for all WSPs   Log Associates   KSH18,231,900.00  View
CWSB/AF-WaSSIP/C/9/2012  Study on incentive based performance for Mombasa Water Sewerage & Company and 6WSPs Staff   Log Associate   KSH15,628,500.00  View
CONTRACT No: CWSB/WaSSIP-AF/C/10/2012  CONSULTANCY SERVICES FOR WASTE WATER MASTER PLAN FOR MOMBASA AND SELECTED TOWNS WITHIN THE COAST REGION   Mangat I.B Patel & Partners Consulting Engineers in association with CES Consulting En-gineers Salzgitter GmbH & BOSCH Holdings  KSH101,204,576.00  View
CWSB/ WaSSIP - AF/C//18/2012   Consultancy Services for Supervision of Works for Rehabilitation of Water Reticulation System in Mombasa – Part of Lot 2.   Smec PTY Limited (Australia)  KSH59,818,078.00  View
CWSB/WaSSIP-AF/C/19/2012   Consultancy Services for Preliminary Designs, Detailed Designs, Tender Document Pre-paration and Works Supervision for Kizingo Waste Water Treatment Plant Rehabilitation Works   Mangat, I.B. Patel & Partners Consulting Engineers   KSH51,457,759.00  View
CWSB/WaSSIP-AF/CDR/23/2012  CONSULTANCY SERVICES FOR SUPERVISION OF DROUGHT RESPONSE CIVIL WORKS   Tertiary Consulting Engineers Ltd (Kenya)   KSH70,246,524.00  View
CWSB/ WaSSIP-AF/C/24/2013  Review of Detailed Design Report of Bute Dam and Construction Supervision of Works   Zam Consult Consulting Engineers  KSH118,230,685.00  View
CWSB/WaSSIP-AF/C/25/2013  CONSULTANCY SERVICES FOR ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY AND PREPARATION OF RESETTLEMENT ACTION PLANS FOR THE PROPOSED WORKS CONTRACTS UNDER COAST WATER SERVICES BOARD   Zamconsult consulting engineering limited  KSH34,567,222.00  View
CWSB/T/01/2015-2016  CONSTRUCTION OF DARAJANI BOREHOLES(Lot 1) The principle components of the works but not limited to: •2No. Borehole drilling and Development at Darajani BH1 & BH 2. •Rising Main from BH 1 to Chitsumwa Primary School within Lunga Lunga Township. •Distribution system from tank at Chitsumwa P. School to Lunga Lunga Township. •Rising Main from BH 2 to Perani & Mwambelezi •2 No. 150m3 Reinforced Masonry Tanks at Chitsumwa P. school and Perani   Zenith Office Expedition Solutions Ltd  KSH35,671,345.60  View
CWSB/T/02/2015-2016  KIKONENI-DZOMBO PIPELINE & WATER KIOSKS(Lot 2) The principle components of the works consist of; •75mm HDPE PN16, 2.5km from Kikoneni to Mwauga Distribution Pipe line •2.75mm HDPE PN16,2.6km from Kikoneni to Mwambalazi Distribution Pipe line •3.90mm HDPE PN16 ,6km Kikoneni to Mrima Distribution Pipe line •4. 75mm HDPE PN16,2.5km from Nguluku to Kitungure Distribution Pipe line •5. 63mm HDPE PN16 ,2km Tudor 4 to Gandini   Sourcing & Construction Industries and Co.Ltd  KSH42,396,062.40  View
CWSB/T/03/2015-2016  Rehabilitation and Augmentation of Mkanda Dam Water Supply Project Phase II LungaLunga Constituency Fencing of Mkanda Dam (Lot 3). The principle components of the works consist of; •Construction of 4km Chain-link fence •Installation of fabricated steel gates •Repair of feeder road   Farjano Construction Co. Ltd  KSH10,846,000.00  View
CWSB/WaSSIP-AF/WDR/14a/2013-02  Construction of Water Supplies in Drought Areas Lot 2 Coast Water Services Board .  Export-Hydro Pump and Services Africa Ltd   KSH47,375,693.69  View
CWSB/WaSSIP-AF/W/18(1a)/2015  Construction of Nyalani Water Supply in Kwale County   Six Star Enterprise Limited   KSH88,425,514.80  View
CWSB/WaSSIP-AF/W/18(2a)/2015  Augmentation of Taveta Lumi Water Supply in Taita County   Oriental Construction Company Limited   KSH74,859,046.92  View
CWSB/T/15/2015-2016  Drilling and Equipping of 8no.Boreholes in Lunga Lunga Sub-County of Kwale County  Vision Point Limited   KSH45,067,660.00  View
CWSB/T/16/2016-2017  Construction of Bidimole and Godo Water Pans in Lunga Lunga Sub-County of Kwale County   Oceanic Construction Company limited   KSH24,626,700.00  View
CWSB/10/2015-2016  Drilling and Equipping of 5no.Boreholes in Mwatate and Voi Sub- County of Taita Taveta County   Export - Hydro Pump and Services ( Africa) Limited   KSH12,951,279.61  View
CWSB/T/04/2016-2017  Provision of Staff Medical Cover   Resolution General Insurance Limited   KSH9,999,903.00  View

Direct Procurement Awards


Procurement Ref No Description Contractor Sum Date Awarded Competion Date
CWSB/WaSSIP/CS/C14/2010  Consultancy services for reconciliation of water service providers (wsps) and coast water services board (cwsb) payables/revenue (debt analysis).   CENTER FOR DEVELOPMENT CONSULTANTS LTD  KSH20,584,281.00  6th November, 2015  24th February, 2015  View

Tender Notices


Ref # Title Publication Date Closing date  
CWSB/WaSSIP-AF/C/7/2012  Consultancy for Reduction in Non Revenue Water (NRW) and Network Modelling for 8 WSPs (Kilifi, Malindi, Lamu, TAVEVO, Kwale, Mombasa, Tana River & Bulk Water)   5th May, 2015 18th May, 2015  View
CWSB/ WaSSIP-AF/W/18(2A)/2015  Augmentation of Taveta Lumi Water Supply  2nd July, 2015 31st July, 2015  View
TENDER NO.CWSB/T/01/2015-2016  REHABILITATION AND AUGMENTATION OF MKANDA DAM WATER SUPPLY PROJECT PHASE II – DARAJANI BOREHOLE WATER PROJECT (LOT 1)  8th July, 2015 21st July, 2015  View
TENDER NO.CWSB/T/02/2015 - 2016   REHABILITATION AND AUGMENTATION OF MKANDA DAM WATER SUPPLY PROJECT PHASE II-KIKONENI – DZOMBO PIPILINE & WATER KIOKS (LOT 2)   8th July, 2015 21st July, 2015  View
CWSB/T/03/2015-2016  REHABILITATION AND AUGMENTATION OF MKANDA DAM WATER SUPPLY PROJECT PHASE II,FENCING OF MKANDA DAM (LOT 3)  8th July, 2015 22nd July, 2015  View
CWSB/T/04/2015-2016  DEVELOPMENT OF WATER SOURCES IN LUNGA LUNGA CONSTITUENCY – DRILLING AND EQUIPING OF BOREHOLES   8th July, 2015 22nd July, 2015  View
CWSB/ WaSSIP-AF/W/1/2014/LOT 1  Augmentation of Baricho Well Field and Electromechanical Works, Baricho Immediate Works- Lot 1  30th July, 2015 28th August, 2015  View
CWSB/WaSSIP-AF/W/18(a1)/2015  Construction of Water Supplies in Drought Areas, Nyalani Water Supply  19th August, 2015 29th September, 2015  View
CWSB/ WaSSIP-AF/W/1/2014/LOT 3  Supply & Construction of Kakuyuni to Gongoni and Kakuyuni to Kilifi Pipeline Works, Baricho Immediate Works - Lot 3   27th August, 2015 14th October, 2015  View
CWSB/WaSSIP-AF/CDR/21/2012  Drought Mitigation Study (Plan) for Northern Water Services Board Region.  28th August, 2015 10th September, 2015  View
CWSB/T/5/2015-2016  Provision of Air Ticketing Services  8th September, 2015 21st September, 2015  View
CWSB/T/06/2015-2016  SUPPLY AND DELIVERY OF CALCIUM HYPOCHLORITE (HTH) 65%  8th September, 2015 21st September, 2015  View
CWSB/T/07/2015-2016  Provision of Motor Vehicle Insurance Services  8th September, 2015 22nd September, 2015  View
CWSB/T/08/2015-2016  Provision of Internet Services and Web Hosting  8th September, 2015 21st September, 2015  View
CWSB/T/09/2015-2016  Provision of Security Services  8th September, 2015 22nd September, 2015  View
CWSB/WaSSIP-AF/W/23/2015  Construction of Water Supplies in Drought Areas, Rehabilitation of Bura Irrigation Scheme Domestic Water Supply  22nd September, 2015 2nd November, 2015  View
CWSB/CRWS&CRP-AFD/MWACHE/C/1/2015  Consulting Services for Mwache Dam Water Treatment Plant Feasibility   2nd October, 2015 23rd October, 2015  View
CWSB/T/07/2015-2016  Provision of Motor Vehicle Insurance Services  25th January, 2016 7th February, 2016  View
CWSB/PPP/C/02/16  EXPRESSION OF INTEREST FOR FUNDING, DESIGN & DESIGN REVIEWS AND CONSTRUCTION OF MZIMA II WATER SUPPLY PROJECT  22nd April, 2016 25th May, 2016  View
CWSB/ WaSSIP-AF/WDR/14A/2013  Construction of Water Supplies in Drought Areas Lot 2  11th May, 2016 9th June, 2016  View
CWSB/T/10/2015-2016  DRILLING OF BOREHOLES, CONSTRUCTION OF PIPELINES AND WATER PAN IN MWATATE AND VOI AND WERUGHA SUB-COUNTIES OF TAITA TAVETA COUNTY   23rd June, 2016 5th July, 2016  View
CWSB/T/11/2015-2016  DRILLING OF BOREHOLES, CONSTRUCTION OF PIPELINES AND WATER PAN IN MWATATE AND VOI AND WERUGHA SUB-COUNTIES OF TAITA TAVETA COUNTY   22nd June, 2016 5th July, 2016  View
CWSB/T/12/2015-2016  DRILLING OF BOREHOLES, CONSTRUCTION OF PIPELINES AND WATER PAN IN MWATATE AND VOI AND WERUGHA SUB-COUNTIES OF TAITA TAVETA COUNTY   22nd June, 2016 5th July, 2016  View
CWSB/T/13/2015-2016  DRILLING OF BOREHOLES, CONSTRUCTION OF PIPELINES AND WATER PAN IN MWATATE AND VOI AND WERUGHA SUB-COUNTIES OF TAITA TAVETA COUNTY   22nd June, 2016 5th July, 2016  View
CWSB/T/14/2015-2016  DRILLING OF BOREHOLES, CONSTRUCTION OF PIPELINES AND WATER PAN IN MWATATE AND VOI AND WERUGHA SUB-COUNTIES OF TAITA TAVETA   22nd June, 2016 5th July, 2016  View
CWSB/T/06/2016-2017  Drilling and capping Boreholes in Mwatate Sub-county of Taita Taveta County  23rd August, 2016 7th September, 2016  View
CWSB/T/07/2016-2017 ( LOT 1- 3)  Construction of Alia 1 Central Water Pans in Mwatate Sub-county of Taita Taveta County (Lot 1),Construction of Alia 2 Water Pans in Mwatate Sub-county of Taita Taveta County (Lot 2)Construction of Iriwenyi Water Pans in Mwatate Sub-county Lot 3  23rd August, 2016 7th September, 2016  View
Goods, Works and Services for the financial years 2016/2017 & 2017/2018.  INVITATION FOR REGISTRATION/PRE-QUALIFICATION OF SUPPLIERS FOR FINANCIAL YEAR 2016-2017& 2017-2018  19th September, 2016 26th September, 2016  View
CWSB/ WaSSIP-AF/W/24/2016  Extension/Construction of Water Supply Pipelines in Korondile, Kinna and Korr in NWSB  28th September, 2016 28th October, 2016  View
TENDER NO. CWSB/T/08/2016-2017  REHABILITATION AND AUGMENTATION OF MKANDA DAM WATER SUPPLY PROJECT PHASE III [NEW TREATMENT WORKS (LOT 1), EXPANSION OF TREATMENT WORKS (LOT 2) AND RAW WATER RISING MAIN (LOT 3)  26th October, 2016 9th November, 2016  View
NCB No: CWSB/WaSSIP-AF/GDR/G21/2016   Supply & Delivery of Five (5no.) 6x4 (4WD) Water Bowsers and Two (2no.) additional 4WD Drought Monitoring Vehicles for NWSB  21st November, 2016 20th December, 2016  View
CWSB/Klf-EQ/W/01/16-17  COAST REGION EQUALIZATION FUND PROJECTS   28th March, 2017 10th April, 2017  View
CWSB/AFD/MWCE/C/1/2017  Consultancy Services for Long Term Technical Assistance (LTTA) for Coast Water Services Board (CWSB) for Implementation of the Mwache Project  13th June, 2017 4th July, 2017  View
CSWB/PPP/02/2017.  REQUEST FOR EXPRESSIONS OF INTEREST (REOI) FOR EPC + Financing Contractors for Baricho Hybrid Power Supply Project.  13th June, 2017 3rd July, 2017  View
Various   COAST REGION NEW PRIORITY PROJECTS  13th June, 2017 28th June, 2017  View
CWSB/AFD/MWCE/C/4/2017  Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Mwache Water Treatment Plant.  1st August, 2017 15th August, 2017  View
CWSB/AFD/MWCE/C/4/2017  Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Mwache Water Treatment Plant.  1st August, 2017 15th August, 2017  View
CWSB/AFD/MWCE/C/4/2017  Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Mwache Water Treatment Plant.  1st August, 2017 15th August, 2017  View
CWSB/AFD/MWCE/C/3/2017  Consultancy Services for Preparation of Detailed Designs, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of all Mwache Dam Transmission Pipelines and associated terminal Reservoirs.   1st August, 2017 15th August, 2017  View
CWSB/AFD/MWCE/C/1/2017  Consultancy Services for Long Term Technical Assistance (LTTA) for Coast Water Services Board (CWSB) for Implementation of the Mwache Project.   29th August, 2017 26th September, 2017  View
CWSB/AFD/MWCE/C/4/2017  Consultancy Services for Preparation of Detailed Designs, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of all Mwache Dam Transmission Pipelines and associated terminal Reservoirs.   29th August, 2017 26th September, 2017  View
CWSB/AFD/MWCE/C/4/2017  Consultancy Services for Preparation of Preliminary Design, Tender Documents, Safeguards (ESIA and RAP) Reports and Construction Supervision of Mwache Water Treatment Plant.   29th August, 2017 26th September, 2017  View
PRO/GEN/VOLI/72  Provision of Goods & Services   10th October, 2017 24th October, 2017  View
PRO/GEN/VOLI/72  Provision of Goods & Services   10th October, 2017 24th October, 2017  View
CWSB/T/05/2017-2018  Provision of Motor Vehicle Insurance   27th February, 2018 12th March, 2018  View
CWSB/T/02A/2017-2018  Supply and Delivery of Calcium Hypochlorite (HTH) 65% (Re-advertised )  27th February, 2018 13th March, 2018  View
CWSB/T/06/2017-2018  Provision of WIBA Insurance Cover   27th February, 2018 12th March, 2018  View
CWSB/T/07/2017-2018  Supply, Delivery and Installation of Wireless Telephone Systems  27th February, 2018 12th March, 2018  View
CWSB/T/08/2017-2018 ( Lot 1 & 2)  Supply and Delivery of 5,000 &10,000 Litres of Plastics Tanks   27th February, 2018 13th March, 2018  View
CWSB/ NDMPIII/W/10/2017-18  Drilling & Equipping of Talio Borehole Voi Constituency Taita Taveta County   1st May, 2018 15th May, 2018  View
CWSB/ NDMPIII/W/111/2017-18  Drilling & Equipping of Chomo Borehole No.7 Lamu West Lamu County   1st May, 2018 15th May, 2018  View
CWSB/ NDMPIII/W/12/2017-18  Drilling & Equipping of Mitsemirini Borehole Ganze Constituency Kilifi County   1st May, 2018 15th May, 2018  View
CWSB/ NDMPIII/W/13/2017-18  Construction & Equiping of high yield Kurawa shallow wells Tana Delta Constituency Tana River   1st May, 2018 16th May, 2018  View
CWSB/ NDMPIII/W/14/2017-18  Drilling & Equipping of Mbita New borehole Kinango Constituency Kwale County   1st May, 2018 16th May, 2018  View